Photo: Hanne Strypet
Just in time: Report on the future of Norwegian electricity grids
On June 14, 2022, a public committee that assessed the development of the power grid presented the Ministry of Petroleum and Energy their Official Report “Grid on time” – on the development of the power grid (NOU 2022: 6). The proposed measures could collectively contribute to a significant boost to the grid development in Norway, by reducing the overall lead time for grid facilities, better utilization of the network, and improve the connection process.